Skip to main content

Allocation Process

Cost allocation is the process of identifying, aggregating, and distributing indirect costs to specific products, work orders, or cost centers.

Overview​

Not all costs can be directly traced to a product. Overhead expenses — such as factory utilities, equipment depreciation, and supervisory salaries — must be allocated using a fair and consistent method.

Step-by-Step Allocation Process​

Step 1: Define Cost Centers​

Set up cost centers that represent departments or functions in your facility (e.g., Machining, Assembly, Quality Control).

Step 2: Collect Indirect Costs​

During the period, indirect costs are posted to the appropriate cost centers:

  • Utilities bills → Machining cost center
  • Maintenance labor → Assembly cost center

Step 3: Choose an Allocation Base​

Select the driver that best reflects how each cost center consumes resources:

Cost CenterSuggested Allocation Base
MachiningMachine hours
AssemblyDirect labor hours
PackagingUnits produced
Quality ControlNumber of inspections

Step 4: Calculate Allocation Rate​

Allocation Rate = Total Overhead Cost / Total Allocation Base

Step 5: Apply Costs to Work Orders​

Multiply the allocation rate by the actual base consumed by each work order:

Allocated Cost = Allocation Rate × Actual Base Consumed

Step 6: Review and Adjust​

At period end, compare applied overhead to actual overhead. Any difference is recorded as an over- or under-absorption adjustment.

Allocation Methods​

  • Fixed Rate — A pre-determined rate applied uniformly throughout the period
  • Actual Rate — Calculated at period end based on real costs incurred
  • Activity-Based Costing (ABC) — Allocates costs based on specific activities that drive costs